Location
Contract Type
Fort Belvoir, VA
IDIQ Task Order Contract
Description
This task order consisted of installing a new water line at an Elementary School. The project installed approximately 2,614 Linear Feet (LF) of 8-inch PVC C900 water main, installed two wet tap sleeves and valves to connect the new PVC water line to the existing 12-inch water main, installed four connections to the existing main, installed four eight-inch gate valves, installed 80 LF of six-inch ductile iron fire service line; installed 80 LF of three-inch PVC C900 pipe, installed 120 cubic yards of stone backfill under existing pavement, restored disturbed asphalt areas including preparation of patch areas to trim and clean pavement patch area and installation of flex base and compaction, and installed erosion and sediment control measures.