Boeing Air Handling Unit No. 9

Size
16,500 SF
Type of contract
Design-Build
IDIQ Task Order
Location
Fort Belvoir, VA
Completion date
December 2017
Construction value
$2,110,400

TMG provided design-build services for the demolition and replacement of Air Handling Unit #9 (AHU#9), ductwork, ceiling and associated equipment serving B areas at the Ft. Belvoir location. The existing system had been in place in excess of 40 years, long exceeding its 25 year design life.

The project involved the approval, procurement, installation, and commissioning of a new 60-ton Trane AHU model and included ductwork, VAV boxes, controls and interfaces to the building monitoring system (FMCS), diffusers and fans, humidification systems and piping, ceiling grid and lighting systems. The new system was designed and installed to integrate into the existing reverse osmosis system in place in Upper C block.

The project affected 16,500 SF of personnel office space.

Project photography not allowed at this site. Stock image provided.

Award Winning Safety

The very first tenet expressed in TMG’s Values Statement is “Safety Matters.” Using this statement as a guiding principle, TMG has developed an award-winning safety record driven by training and attention to detail.

Award Winning Safety